TTN

Palazzo Versace Dubai

Share  

Project Type: Real estate/ hospitality
Estimated Completion: Q1 2015
Estimated Value: $626 million
Estimated Area: 130,000 sq m built-up area
Status: Under execution
Location: Dubai Creek, Dubai, UAE

PROJECT DETAILS

Enshaa is on track with its plans to develop Palazzo Versace resort located within Culture Village of Dubai Creek in Dubai, UAE. The construction is ongoing as of January and is expected to be completed in Q1 2015.

The Palazzo Versace Dubai Resort and Condominiums will have a built-up area of 130,000 sq m on a premium waterfront location with unobstructed views of the creek. The residential wings of Ala Destra and Ala Sinistra will offer 169 luxury condominiums ranging from one to six bedrooms with access to the hotel's services. The hotel will comprise a day spa, restaurants and 215 hotel suites furnished with an exclusive line of products from the Versace Home Collection.

The project has a waterfront setting and will possess spectacular architecture, Italian furnishings, extraordinary service and an ambience of pure glamour. The hotel will have  fabulous restaurants, a "water salon" around a stunning lagoon-style pool, a state-of-the-art gymnasium, a sensual world class day spa and opulent meeting and conference facilities.

The project in Dubai is the second Palazzo Versace after the first one in Australia’s Gold Coast.

Emirates Sunland Group is the PMC, EFECO is the MEP consultant and Hyder Consulting Group is the structural engineering consultant.

SCOPE OF WORK
Construction of a 130,000-sq-m hotel and condominium including:

- 217 suites
- 169 private residences
- Restaurants
- Swimming pools
- Gymnasium
- World class day spa
- Meeting and conference facilities

- Landscape areas

COMPANIES & PROJECT PERSONNEL

*Owner: Enshaa Services Group
Address:
Emirates Financial Tower, 2nd Floor, Dubai International Financial Centre Area, P O Box 506847, Dubai, UAE
Tel: +971 4-303-5555
Fax: +971 4-303-5556
Email: info@enshaa.ae
Website: www.enshaa.ae

Contact Name: Ben Paulley
Position: Project Manager
Tel: +971 4-409-2900
Email: bpaulley@enshaa.ae

*MEP Consultant: Emirates Falcon Electromechanical Company
Address:
P O Box 42661Dubai, UAE
Tel: +971 4-356-9000
Fax: +971 4-326-3777

Contact Name: Elvis Dsouza
Position: Senior Document Controller
Tel: +971 4-326-3636 ext: 187

*Engineering Consultant: Hyder Consulting Middle East
Address:
Building 54 Building, 1st Floor, Oud Al Metha Road, Dubai Healthcare City, P O Box 52750, Dubai, UAE
Tel: +971 4-324-2532
Fax: +971 4-324-2531

Contact Name: Kabeer Daskarundka
Position: Projects Director
Tel: +971 4-324-2532 ext: 428

*Construction Contractor / MEP Contractor: Arabtec Construction
Address:
Arabtec Building, Sheikh Zayed Road, Street 4, Al Quoz Industrial Area 4, P O Box 3399, Dubai, UAE
Tel: +971 4-340-0700
Fax: +971 4-340-4004
Email: arabtec@arabtecuae.com
Website: www.arabtecuae.com

Contact Name: Brad Doherty
Position: Project Manager
Tel: +971 4-324-2767

TIMELINE
January 2015 - Construction of the hotel was ongoing.

April 2010 - Construction of the hotel re-started.

March 2010 – 60 per cent of the overall project was completed.

May 2007 – Ground-breaking ceremony took place.

May 2006 - Construction contract awarded to Arabtec Construction Company.

Spacer