Owner: Jumeirah Group (LLC)
Project Type: Real Estate / Hotels
Estimated Value: $ 680 million
Project Start Date: November 2012
Estimated Completion: Q1 2016
Estimated Area: 100,000 sq m Built Up Area
Status: Under execution
Location: Jumeirah, Dubai, UAE
Contractors:
Architectural Design Consultants – Design
Aurecon Engineering International Limited - Structural engineering / Engineering (Infrastructure) / Civil engineering
CKR Consulting Engineers - Dubai - MEP
Woods Bagot – Architect
Al-Futtaim Carillion LLC – Main construction contractor
The Arabian Resort also known as phase 4 of the Madinat Jumeirah Expansion is being constructed at Jumeirah, Dubai, UAE. The project is headed by the Jumeirah Group and is expected to be completed in the first quarter of 2016. The project aims at expanding the Madinat Jumeirah by adding a 100,000 sq m hotel resort with associated facilities. The project will consist of a 100,000 sq m 435 key five-star hotel resort that includes 45 luxury villas and hotel apartments,400 parking bays, three specialty restaurants, lounges, bars, a business center, swimming pools and a turtle lagoon. It will also house a commercial centre and spa among other amenities. This combination of authentic Arabian themes has created a destination of unique qualities and outstanding beauty. Madinat Jumeirah is a city of contrasts - from the sublimely relaxing to the vibrant and exotic. The Resort is a recreation of old Arabia and a place where historic beauty meets new-fashioned luxury. The traditional Arabian town will comprise of two boutique hotels - Al Qasr and Mina A'Salam and a courtyard of 29 summer houses called Dar Al Masyaf. Woods Baggot is the architect consultant, Architectural Design Consultants (ADC) is the design consultant, Aurecon is the structural, civil and infrastructure engineer consultant for the project and CKR Consulting Engineers is the MEP consultant. SCOPE OF WORK Construction of a 100,000 sq m five-star hotel resort including: - 435 rooms
- 400 parking bays
- 45 luxury villas
- hotel apartments
- 3 specialty restaurants
- lounges
- bars
- business center
- swimming pools
- a turtle lagoon.
COMPANIES & PROJECT PERSONNEL *Owner: Jumeirah Group (LLC)
Address: Jumeirah Group (LLC) Building, Al Sufouh Road, Madinat Jumeirah, P O Box 73137, Dubai, UAE
Tel: +971 4-366-5000
Fax: +971 4-366-5001
Email: info@jumeirah.com
Website: www.jumeirah.com
*Architect Consultant: Woods Bagot
Address: Emarat Arium Building, Sheikh Zayed Road, Dubai, UAE
Tel: +971 4-321-2166
Fax: +971 4-321-2177
Email: wbdxb@woodsbagot.com
Website: www.woodsbagot.com.au
*Engineering Consultant (Infrastructure / Structural / Civil): Aurecon Engineering International Limited
Address: Elite Business Center Building, Office 111, Sheikh Zayed Road, Al Barsha Area 1, PO Box 37596, Dubai, UAE
Tel: +971 4-325-5576
Fax: +971 4-354-9799
Email: dubai@aurecongroup.com
Contact Name: Wouter Drand
Position: Project Director
Email: wouter.drand@aurecongrou.com
*Construction Contractor: Al-Futtaim Carillion LLC
Address: Al-Futtaim Carillion LLC Building, Ras Al Khor Street, Ras Al Khor Third Industrial Area, P O Box 1811, Dubai, UAE
Tel: +971 4-333-1200
Fax: +971 4-333-1018
Email: afc@afcarillion.ae
Website: www.afcarillion.ae Contact Name: Donald Coleman
Position: Project Director
Tel: +971 2-556-7845 *Design Consultant: Architectural Design Consultants
Address: Nassima Tower, Sheikh Zayed Road, Dubai, P O Box 6826, Dubai, UAE
Tel: +971 4-386-8618
Fax: +971 4-386-8619
Email: info@adcconsultant.com
Website: www.adcconsultant.com/
MEP Consultant: CKR Consulting Engineers – Dubai
Address: Al Kuthban Building, Mezzanine Floor, Office 3, Sheikh Zayed Street, Al Quoz Industrial Area 1, PO Box 73889, Dubai, UAE
Tel: +971 4-338-4277, +971 4-343-6998
Fax: +971 4-338-4299
Website: www.ckr.ae Contact Name: John Kurian
Position: Projects Manager
Email: jkurian@ckr.ae
8MEP Sub-Contractor: BK Gulf LLC
Address: Dutco Balfour Building, 1st Floor, Jebel Ali Second Industrial Area, PO Box 10079, Dubai, UAE
Tel: +971 4-880-1606, +971 4-880-1900
Fax: +971 4-880-1603
Email: bkgulf@emirates.net.ae
Website: www.bkgulf.com Contact Name: Robert Strang
Position: Business Development Manager
Email: robert.strang@bkgulf.com
TIMELINE February 2014 - Construction of the hotel was ongoing. Q3 2014 - MEP sub-contract awarded to BK Gulf. June 2014 - Construction of the hotel started. May 2014 - Al Futtaim Carillion was selected as contractor for the hotel resort. November 2012 - The project was announced.